Establishment of Bangus Processing Facility



The dryer and smoke house
(SPIN: 06-594-08-05)

PROJECT BENEFICIARY:

Biliran Agri-Center
Mr. Gerardo S. Espina, Sr.
Naval, Biliran
Biliran (Lone District)

DATE APPROVED: March 2006

SETUP FUNDING: P 820,000.00

NATURE OF PROJECT: The project involves the acquisition of equipment, such as smoke house and dryer, for production of deboned smoked bangus (milk fish). The project was assisted by ITDI by providing design and specifications of the drier.

STATUS OF PROJECT: Terminated. The proponent backed out from the project before the major equipment was delivered since their Bangus production was totally damaged by typhoons. The equipment was currently placed under care of Cabucgayan LGU in 2009 demonstration project. The demonstration period was terminated early in 2010 and the equipment is ready for transfer to interested user.